18–26 Sept 2025
Ito International Research Center
Asia/Tokyo timezone

Status of the power coupler for the half wave resonator in IRIS

MOP63
22 Sept 2025, 14:30
3h
Ito International Research Center

Ito International Research Center

Tokyo
Board: MOP63
Poster Presentation MC4: SRF Technologies Monday Poster Session

Speaker

Sungmin Jeon (Kyungpook National University)

Description

A heavy-ion accelerator facility was constructed for the Rare Isotope Science Project (RISP) at the Institute for Rare Isotope Science (IRIS) in Daejeon, Korea. The cryomodule with quarter-wave resonators (QWRs) and half-wave resonators (HWRs) was installed in the SCL (Superconducting Linac) 3 tunnel, and the beam commissioning (Beam energy = 16.4 MeV/u, 40Ar8+) has been completed. The geometry of the power coupler for the HWRs is a coaxial capacitive type based on a conventional 1-5/8 inch electronic industries alliance (EIA) 50 Ω coaxial transmission line with a single ceramic window. The multi-physics analysis, which includes electromagnetic, thermal, and mechanical analysis, was performed by ANSYS to evaluate the thermal expansion of the power couplers. In this paper, we present the analysis results and revised design of the power coupler for HWRs.

I have read and accept the Privacy Policy Statement Yes

Author

Dr Junyoung Yoon (Institute for Basic Science)

Co-authors

Eiji Kako (High Energy Accelerator Research Organization) Mr Daeboo Cha (Vitzro Tech (South Korea)) Mr Dongkeun Lee (Vitzro Tech (South Korea)) Yeonsei Chung (Institute for Basic Science) Mr Yong Woo Jo (Institute for Basic Science) Yong-Sub Cho (Korea Atomic Energy Research Institute, Institute for Basic Science) Dr Yoochul Jung (Institute for Basic Science) Dr Youngkwon Kim (Institute for Basic Science) Sungmin Jeon (Kyungpook National University)

Presentation materials

There are no materials yet.