Mass production of cavities and cryomodules for SHINE project are underway. Up to now, more than 50 mid-T baked cavities and 100 N-doped cavities have been vertical tested. Most of them have been assembled into cryomodules and tested, achieving high Q and quite high gradient. Two special cryomodules (CMs) for SHINE injector have been commissioned, reached their designed voltage. High-Q CMs are gradually installed into the Linac section. Two 3.9 GHz CMs have been assembled and tested, achieved excellent performance. This presentation will cover the progress of production, the performance of cavities and CMs, the upgrade of SRF infrastructures and so on.

I have read and accept the Privacy Policy Statement Yes

Author

Jinfang Chen (Shanghai Advanced Research Institute)

Presentation materials

There are no materials yet.