Low beta cavity production based on a novel procedure at IMP

THP58
25 Sept 2025, 14:30
3h
Ito International Research Center

Ito International Research Center

Tokyo
Board: THP58
Poster Presentation MC1: SRF Facilities Thursday Poster Session

Speaker

Zhijun Wang (Institute of Modern Physics, Chinese Academy of Sciences)

Description

Three superconducting linear accelerators are under construction at the Institute of Modern Physics (IMP) of the Chinese Academy of Sciences (CAS). 96 superconducting radio frequency (SRF) cavities housed in 17 cryomodules were fabricated, preparation and installed in the accelerator tunnel in 14 months. The cold test of the SRF cavity and cryomodule is skipped due to our excellent full-process quality control. The mass production of SRF cavity shows good performance, a higher accelerating gradient than the operation specification is achieved. In this paper, an overview of the cavity design, production fabrication, string and cryomodule assembly, efforts for SRF cavity performance recovery and operation status are introduced.

I have read and accept the Privacy Policy Statement Yes

Author

Zhijun Wang (Institute of Modern Physics, Chinese Academy of Sciences)

Co-authors

Feng Bai (Institute of Modern Physics) Shichun Huang (Institute of Modern Physics) TIANCAI JIANG (Institute of Modern Physics) Yuan He (Institute of Modern Physics, Chinese Academy of Sciences) Mr shengxue zhang (Institute of Modern Physics)