We have Cavity Fabrication Facility (CFF) at KEK which is a dedicated facility to fabricate SRF cavities. CFF was constructed in the year 2011 and now it has two Electron-Beam Welding (EBW) machines, a press-forming machine, a lathe, a Chemical-Polishing room, and so on in clean rooms. We have been mainly focusing on the fabrication of 1.3-GHz Nb elliptical 9-cell cavities. Recently we fabricated six single-cell cavities where four of them were made from conventional Fine-Grain (FG) Nb material and two of them were made from the Medium-Grain (MG) Nb material which has the grain-size ranging from sub-mm to mm. We also fabricated three 9-cell cavities where two of them were made from FG Nb material and one of them was made from MG Nb material. The fabrication of MG-Nb 9-cell cavity is the first trial in the world. This presentation reports the updated status of machines and the detailed status of fabrication of cavities in CFF at KEK.

Funding Agency

This work is supported by “MEXT Development of key element technologies to improve the performance of future accelerators Program”, Japan Grant Number JPMXP1423812204.

I have read and accept the Privacy Policy Statement Yes

Author

Takayuki Saeki (High Energy Accelerator Research Organization)

Co-authors

Mr Hitoshi Inoue (High Energy Accelerator Research Organization) Prof. Masahiko Hiraki (High Energy Accelerator Research Organization) Takeshi Dohmae (High Energy Accelerator Research Organization) Mr Yuichi Watanabe (High Energy Accelerator Research Organization)

Presentation materials

There are no materials yet.