18–26 Sept 2025
Ito International Research Center
Asia/Tokyo timezone

Construction of the LB650 pre-production cryomodule for the PIP-II linear accelerator

THP69
25 Sept 2025, 14:30
3h
Ito International Research Center

Ito International Research Center

Tokyo
Board: THP69
Poster Presentation MC4: SRF Technologies Thursday Poster Session

Speaker

Guillaume Devanz (Commissariat à l'Energie Atomique)

Description

The Proton Improvement Plan II (PIP-II) that will be installed at Fermilab is the first U.S. accelerator project that will have significant contributions from international partners. CEA joined the international collaboration in 2018 and will deliver 10 low-beta cryomodules as In-Kind Contributions to the PIP-II project, with cavities supplied by LASA-INFN (Italy) and VECC-DAE (India), and power couplers and tuning systems supplied by Fermilab. This paper will detail the activities at CEA on the construction of the LB650 pre-production cryomodule.

I have read and accept the Privacy Policy Statement Yes

Author

Nicolas Bazin (Commissariat à l'Energie Atomique)

Co-authors

Claire Simon (Commissariat à l'Energie Atomique) Guillaume Devanz (Commissariat à l'Energie Atomique) Hassen Jenhani (CEA Paris-Saclay) Mr Robin Cubizolles (Commissariat à l'Énergie Atomique et aux Énergies Alternatives) Dr Stéphane Berry (Commissariat à l'Énergie Atomique et aux Énergies Alternatives)

Presentation materials

There are no materials yet.