Commissariat à l'Energie Atomique
Author in the following contributions
- Coupler installations on cavities at CEA followed by high power test in horizontal cryostat at Fermilab prior to the assembly of the PIP-II LB650 pre-production cryomodule
- Progress of assembly and installation of LIPAc SRF cryomodule under the EU–JA collaborative framework
- Assembly of the LIPAc SRF LINAC cryomodule
- Construction of the LB650 pre-production cryomodule for the PIP-II linear accelerator
- PIP-II LB650 cryomodules test bench at CEA
- Semi-automatic robot assisted, clean assembly of PIP-II LB650 cavity string at CEA