Speaker
Zhongyuan Yao
(TRIUMF)
Description
The High-Luminosity Large Hadron Collider (HL-LHC) project is to increase the integrated luminosity by a factor of 10 beyond the LHC’s design value. TRIUMF is collaborating with CERN, UK and US-AUP to provide five RF dipole (RFD) crab cavity cryomodules to HL-LHC as Canadian contribution. A prototype cryomodule (TCM0) is being assembled to qualify TRIUMF’s infrastructure, procedure and tooling. The experience and lessons learned on TCM0 will be applied to the series production cryomodules. This paper will give updates of the progress of TCM0 string assembly, including infrastructure readiness, tooling and fixture readiness, prototype cavity acceptance, and the status of the string assembly.
I have read and accept the Privacy Policy Statement | Yes |
---|
Author
Zhongyuan Yao
(TRIUMF)
Co-authors
Ben Matheson
(TRIUMF)
Bhalwinder Waraich
(TRIUMF)
Devon Lang
(TRIUMF)
James Keir
(TRIUMF)
Oliver Law
(TRIUMF)
Philipp Kolb
(TRIUMF)
Robert Laxdal
(TRIUMF)
Ruminder Sekhon
(TRIUMF)