9–13 Sept 2024
Wanda Realm Beijing
Asia/Shanghai timezone
Registration Deadline: August 9 (23:59 UTC+8), 2024; Paper Submission Deadline: September 5 (23:59 UTC+8), 2024

Beam diagnostics control system upgrade of IPM LINAC

WEP58
11 Sept 2024, 14:20
1h 30m
China Hall 3

China Hall 3

Poster Presentation MC7: Data Acquisition and Processing Platforms WEP: Wednesday Poster Session

Speaker

Samira Mohammadi Alamouti (Iranian Light Source Facility)

Description

A series of upgrades has now begun to industrialize the applications of the experimental IPM electron LINAC. This includes upgrading the control system of the diagnostics tools and adding new tools and equipment to the system as well.
We are aiming to build an integrated control system to collect and manage all diagnostics signals. This will allow us to continuously monitor and archive all of the beam parameters for LINAC performance analysis and improvement. It is hence decided that we migrate from LabVIEW to an EPICS-based control system which has many advantages in this regard. In the meantime, it is also required to employ more modern equipment with better control interfaces and add some extra diagnostics tools to the system as well. So during this upgrade, most of the job would be developing new control interfaces and high-level applications accordingly.
In this paper, after a brief summary of the current diagnostics tools and our motivation for this upgrade, the scheme of the new control system and how different parts are integrated to the EPICS framework will be described.

I have read and accept the Privacy Policy Statement Yes

Primary author

Pedram Navidpour (Iranian Light Source Facility)

Co-authors

Samira Mohammadi Alamouti (Iranian Light Source Facility) Zahra Rezaei (Iranian Light Source Facility)

Presentation materials

There are no materials yet.