9–13 Sept 2024
Wanda Realm Beijing
Asia/Shanghai timezone
Pre-press Proceedings: https://proceedings.ihep.ac.cn/ibic2024/

Electronic test bench for the validation of myrrha BPM ac-quisition systems

TUP37
10 Sept 2024, 16:00
1h 30m
China Hall 3

China Hall 3

Poster Presentation MC3: Beam Position Monitors TUP: Tuesday Poster Session

Speaker

Dr Sidi Mohammed Ben Abdillah (Université Paris-Saclay, CNRS/IN2P3, IJCLab)

Description

MYRRHA (Multi-Purpose Hybrid Research Reactor for High-Tech Applications) aims to demonstrate the feasibility of high-level nuclear waste transmutation at industrial scale. MYRRHA Facility aims to accelerate 4 mA proton beam up to 600 MeV.
Beam Position monitors are key elements in many accelerators. for instance, once BPMs are installed along a linear accelerator or a storage ring, they remain inaccessible for any validation of updated or rejuvenated electronics. this paper addresses this issue with the realisation of an electronic test bench simulating the outputs signals of BPM electrodes for a given beam energy, phase and position. the bench is realized for MYRRHA BPMs and it offers simulated beams with a position precision down to 50μm and phase precision down to 0.5° on a wide range.

I have read and accept the Privacy Policy Statement Yes

Primary author

Dr Sidi Mohammed Ben Abdillah (Université Paris-Saclay, CNRS/IN2P3, IJCLab)

Presentation materials