9–13 Sept 2024
Wanda Realm Beijing
Asia/Shanghai timezone
Early Registration Deadline: July 1, 2024(Monday)

SOLEIL II Beam Position Monitors: design, simulations and button prototyping.

10 Sept 2024, 16:00
1h 30m
China Hall 3

China Hall 3

Poster Presentation MC3: Beam Position Monitors TUP: Tuesday Poster Session

Speaker

Moussa El Ajjouri (Synchrotron Soleil)

Description

SOLEIL II is the low emittance upgrade project for Synchrotron SOLEIL, targeting an emittance of ~80 pm.rad. The new lattice includes 180 Beam Position Monitors (BPM). Due to the different constraints on the magnet yokes, beam stay clear and synchrotron radiation, 3 different types of BPM will be installed on the storage ring with inner diameter distributed between 16 and 24 mm. Electromagnetic and thermal simulations have been conducted to validate the designs.
Manufacturing the feedthroughs is a challenge due to the conical shape of the button and the small (200 µm) thickness of the gap with the BPM body. Prototypes of the button have been made by two different manufacturers, and possibilities for improvement identified. These prototypes will test in the current machine to validate the simulation results.
This paper presents the designs, summarizes the results of the simulations, and describes the metrology process and results of the two batches of feedthroughs.

I have read and accept the Privacy Policy Statement Yes

Primary authors

Moussa El Ajjouri (Synchrotron Soleil) Nicolas Hubert (Synchrotron Soleil)

Co-authors

Alexis Gamelin (Synchrotron Soleil) Mr Filipe Alves (Synchrotron Soleil) Mrs Zhengxuan Fan (Synchrotron Soleil)

Presentation materials

There are no materials yet.