MC03: Beam Position Monitors

MOT
31 Aug 2026, 15:10
Rainbow Theatre (Whistler Conference Centre)

Rainbow Theatre

Whistler Conference Centre

4010 Whistler Way, Whistler, BC

Presentation materials

There are no materials yet.

  1. Michael Chin (Lawrence Berkeley National Laboratory)
    31/08/2026, 15:10
    MC03: Beam Position Monitors
    Invited Oral Presentation

    The ALS has been running with an in-house designed Beam Position Monitor for over 10 years. A new design has been developed for the ALS-U project. It includes 8 inputs per pizza-box chassis, an improved Pilot Tone generation for the two button sets, a modular packaging for upgrades and adapting to other machine RF, and improved performance.

    The ALS-U BPM uses an AMD Gen3 RFSOC, which...

    Go to contribution page
  2. Claire Houghton (Diamond Light Source)
    31/08/2026, 15:40
    MC03: Beam Position Monitors
    Contributed Oral Presentation

    The upgrade of Diamond Light Source to the 4th generation storage ring, Diamond-II, introduces significant changes in the white photon beam properties. Upgrades to the existing XBPM hardware are underway to accommodate increased beam power while maintaining high position sensitivity across beamlines. XBPM blade geometries and positions were optimised using Synchrotron Radiation Workshop (SRW)...

    Go to contribution page
  3. Laura Pedraza (Instituto de Física Corpuscular)
    31/08/2026, 16:00
    MC03: Beam Position Monitors
    Contributed Oral Presentation

    A re-entrant cavity beam position monitor (cBPM) has been designed using CST Studio Suite electromagnetic simulations to provide high-resolution spatial measurements for future colliders. This model, operating at 1.630 GHz, offers improved theoretical performance compared to previous prototypes by increasing the normalized shunt impedance (R/Q) and the loaded quality factor (Q_L), which...

    Go to contribution page
  4. Giusy Valeria Passarelli (European Organization for Nuclear Research)
    31/08/2026, 16:20
    MC03: Beam Position Monitors
    Contributed Oral Presentation

    This paper presents the design of a novel semi-coaxial stripline pickup for wide-band beam diagnostics. Four electrodes inside the beam pipe form a quasi-coaxial transmission line that improves electromagnetic field control and provides a smooth impedance transition, mitigating the bandwidth limitations and impedance discontinuities typical of conventional stripline pickups. Electromagnetic...