PIP-II beam instrumentation for beam commissioning

MOP016
31 Aug 2026, 16:40
2h
Ballroom C (Whistler Conference Centre)

Ballroom C

Whistler Conference Centre

Poster Presentation MC09: Overview and Commissioning Monday Poster Session 1

Speaker

Victor Scarpine (Fermi National Accelerator Laboratory)

Description

As part of the new Proton Improvement Plan (PIP-II), Fermilab is undertaking the development of a new 800 MeV, 2 mA H- superconducting RF linac to replace its present normal conducting 400 MeV linac. The PIP-II linac consists of a series of superconducting RF cryomodules from 2.1 MeV to 800 MeV, with instrumentation warm units between cryomodules. Commissioning of this new accelerator will occur in stages starting in 2027. This paper will describe the staged beam commissioning plan, as well as the permanent and temporary beam instrumentation to be used.

Funding Agency

This manuscript has been authored by FermiForward Discovery Group, LLC under Contract No. 89243024CSC000002 with the U.S. Department of Energy, Office of Science, Office of High Energy Physics.

I have read and accept the Privacy Policy Statement Yes
Paper submission software MSWord

Author

Victor Scarpine (Fermi National Accelerator Laboratory)

Co-authors

Darren Crawford (Fermi National Accelerator Laboratory) Michelle Ibrahim (Fermi National Accelerator Laboratory) Nathan Eddy (Fermi National Accelerator Laboratory) Randy Thurman-Keup (Fermi National Accelerator Laboratory) Alexander Shemyakin (Fermi National Accelerator Laboratory) Eric Letcher (Fermi National Accelerator Laboratory) Derek Steinkamp (Fermi National Accelerator Laboratory) Dakota Krokosz (Fermi National Accelerator Laboratory)