9–13 Sept 2024
Wanda Realm Beijing
Asia/Shanghai timezone
Early Registration Deadline: July 1, 2024(Monday)

The timeless timing system

12 Sept 2024, 16:00
1h 30m
China Hall 3

China Hall 3

Poster Presentation MC5: Longitudinal Diagnostics and Synchronization THP: Thursday Poster Session

Speaker

Tonia Batten (Canadian Light Source Inc.)

Description

The Canadian Light Source (CLS) is a third generation 2.9 GeV synchrotron comprised of a 250 MeV LINAC, a full energy booster, and a storage ring with 13 insertion devices and 22 operational beamlines ranging from infrared light to hard X-rays.
The Timing System supplies the triggers required to synchronize operation of all components responsible for injecting current into the storage ring. Signals from the Timing System can also be used to synchronize data acquisition on beamlines.
The Trigger Generator Unit (TGU), which was designed by the CLS, is the centerpiece of the timing electronics. The TGU is driven by the 500 MHz master oscillator and is controlled using digital I/O. The trigger signals are distributed via a fiber optic system, which was also designed in house.
The Timing System has been in operation since 2001 and has proven itself to be stable and robust. This paper provides a detailed overview of the system and its history and operational performance.

Funding Agency

Research at the CLS is funded by CFI, NSERC, NRC, CIHR, WD, Government and University of Saskatchewan.

I have read and accept the Privacy Policy Statement Yes

Primary author

Tonia Batten (Canadian Light Source Inc.)

Co-author

Johannes Vogt (Canadian Light Source Inc.)

Presentation materials

There are no materials yet.