Speaker
Description
With the application of in (RCS) of China Spallation Neutron Source(CSNS), space charge effect has been mitigated effectively, the beam power is reaching 170kW with stable operation. However, under high beam power conditions, the strong beam loading effect becomes the primary challenge for the second harmonic RF system. In order to keep system run steadily under complex working conditions, this study constructs a simulation model containing analysis of status of magnetic alloy loaded cavity, power source, Low-Level Radio Frequency con-trol system (LLRF) and RF system of beam based on LTspice platform. In comparison of simulation result and beam commissioning data, the high reliability of the model has been tested. This study provides an important technical tool to optimize RF systems for high-intensity beam operation.
I have read and accept the Privacy Policy Statement | Yes |
---|