High Energy Accelerator Research Organization
Author in the following contributions
- Scenario of beam-based alignment with new BPM system for future beam commissioning of 1.3-MW operation at the J-PARC Main Ring
- Recent beam study results and strategy for 1.3 MW operation in J-PARC MR
- The experimental evaluation of third-order resonance correction using 8 Trim-S in J-PARC MR
- Third-order resonances and the correction in J-PARC MR
- Recent optics measurements and corrections for high-intensity operation of the J-PARC Main Ring