17–22 May 2026
C.I.D
Europe/Zurich timezone

Additional installation effort for the 3MW readiness at ESS

MOP7037
18 May 2026, 16:00
2h
C.I.D

C.I.D

Deauville, France
Poster Presentation MC7.T07: Superconducting RF Poster session

Speaker

Mr Artur Krawczyk (European Spallation Source)

Description

Since the last installation campaign, additional High-Beta (HB) cryomodules (CM) have been tested and qualified Ready-for-Installation (RFI) at the ESS Test Stand. Their installation was planned for the summer’25, right after the first Beam On Dump (BOD) commissioning phase and a complete warm-up of the accelerator. The number of HB CM has raised to 11 out of 21 allowing for a potential maximum power of the Linac of 3 MW. This paper will present the lessons learned from the previous phase as well as the necessary measures taken in order to install 6 cryomodules in a RP controlled area in only 3 months.

In which format do you inted to submit your paper? LaTeX
Preprint marking on your proceeding paper I wish my paper to be marked as preprint.
I no longer wish to present this contribution, please withdraw it. Keep my contribution

Author

Henry Przybilski (European Spallation Source)

Co-authors

Ms Agnieszka Zwozniak (European Spallation Source) Artur Gevorgyan (European Spallation Source) Mr Artur Krawczyk (European Spallation Source) Cecilia Maiano (European Spallation Source) Domenic Nicosia (European Spallation Source) Mr Emilio Asensi (European Spallation Source) Emmanouil Trachanas (European Spallation Source) Jianqin Zhang (European Spallation Source) Marek Skiba (European Spallation Source) Nuno Elias (European Spallation Source) Paolo Pierini (European Spallation Source) Per Nilsson (European Spallation Source) Philipp Arnold (European Spallation Source) Walther Borg (European Spallation Source)

Presentation materials

There are no materials yet.