19–24 May 2024
Music City Center
US/Central timezone

Session

THAD: Beam Instrumentation, Controls, Feedback and Operational Aspects (Contributed)

THAD
23 May 2024, 09:30
Music City Center

Music City Center

201 Rep. John Lewis Way S, Nashville, TN 37203, USA

Conveners

THAD: Beam Instrumentation, Controls, Feedback and Operational Aspects (Contributed)

  • Fernando Sannibale (Lawrence Berkeley National Laboratory)

Presentation materials

There are no materials yet.
Shinji Ogawa (High Energy Accelerator Research Organization)
23/05/2024, 09:30
MC6.T03 Beam Diagnostics and Instrumentation
Contributed Oral Presentation

Anomalous magnetic moment (g-2) of a muon has been precisely measured by the BNL and FNAL experiments, and there is a discrepancy from the Standard Model prediction. A new measurement of muon g-2 is planned at J-PARC based on a different strategy. In the J-PARC experiment, a low emittance 300 MeV muon beam is injected into a compact storage orbit by newly developed 3-D spiral injection...

Oliver Stringer (Cockcroft Institute)
23/05/2024, 09:50
MC6.T03 Beam Diagnostics and Instrumentation
Contributed Oral Presentation

A novel beam gas curtain (BGC) monitor was installed in the LHC as part of CERN’s High Luminosity LHC upgrade during the 2022 year-end technical stop and started to measure the profile of the proton and lead ion beams during the 2023 run. The monitor utilizes a supersonic neon beam shaped into a curtain that crosses the primary LHC beam with an angle of 45 degrees. By observing the...

Dr Abdurahim Oguz (Oak Ridge National Laboratory)
23/05/2024, 10:10
MC6.T23 Machine Protection
Contributed Oral Presentation

We propose and demonstrate a time-resolved, two-dimensional temperature monitoring technique for nanocrystalline diamond stripper foils exposed to high-intensity hydrogen ion (H-) beams at the Spallation Neutron Source (SNS) accumulator ring which is independent of foil emissivity. The technique utilizes a two-color imaging pyrometer in the shortwave infrared (SWIR) spectral band to measure...

Building timetable...