19–24 May 2024
Music City Center
US/Central timezone

Beam position monitoring system and beam commissioning at APS-U Storage ring

WEPG01
22 May 2024, 16:00
2h
Bluegrass (MCC Exhibit Hall A)

Bluegrass

MCC Exhibit Hall A

Poster Presentation MC6.T03 Beam Diagnostics and Instrumentation Wednesday Poster Session

Speaker

Weixing Cheng (Argonne National Laboratory)

Description

Advanced Photon Source Upgrade (APS-U) storage ring, currently in installation and testing, is set for beam commissioning in early 2024. In the APS-U storage ring, there are 560 Beam Position Monitor (BPM) pickups, each equipped with high resolution electronics. This paper presents outcomes from pre-beam testing and beam commissioning of the APS-U BPM system. We discuss tailored features for advanced beam measurements, testing methodologies, challenges, and successful integration into the storage ring. Our findings demonstrate the robustness of the BPM system, emphasizing its crucial role in achieving the first beam and optimizing the APS-U storage ring's performance.

Funding Agency

This research used resources of the Advanced Photon Source, operated for the U.S. Department of Energy Office of Science by Argonne National Laboratory under Contract No. DE-AC02-06CH11357.

Region represented North America
Paper preparation format Word

Primary author

Weixing Cheng (Argonne National Laboratory)

Co-authors

Adam Brill (Argonne National Laboratory) Dr Nicholas Sereno (Argonne National Laboratory) Pavana Kallakuri (Argonne National Laboratory) Xiang Sun (Argonne National Laboratory)

Presentation materials

There are no materials yet.