19–24 May 2024
Music City Center
US/Central timezone

Status of the power coupler for the half wave resonator in IRIS

WEPS29
22 May 2024, 16:00
2h
Blues (MCC Exhibit Hall A)

Blues

MCC Exhibit Hall A

Poster Presentation MC7.T07 Superconducting RF Wednesday Poster Session

Speaker

Dr Junyoung Yoon (Institute for Basic Science)

Description

The Institute of Rare Isotope Science(IRIS) has a heavy-ion accelerator facility in Daejeon, Korea. The cryomodule with quarter-wave resonators (QWR) and half-wave resonators (HWR) were also installed in the SCL3 tunnel and a beam operation test (Beam energy = 17.6 MeV/u) was performed. However, the frequency drift of the HWR is one of the failures of the beam control. Therefore, the multi-physics analysis, which includes electromagnetic, thermal, and mechanical analysis, is performed to evaluate the deformation of the outer conductor and the antenna of the power coupler. The required power of the power coupler for HWR is 4 kW in CW mode at 162.5 MHz. The geometry of the power coupler is a coaxial capacitive type based on a conventional 1-5/8 inch electronic industries alliance (EIA) 50 Ω coaxial transmission line with a single ceramic window. In this paper, we present the status and analysis results of the power coupler for HWR.

Funding Agency

Institute for Rare Isotope Science

Region represented Asia
Paper preparation format LaTeX

Primary author

Dr Junyoung Yoon (Institute for Basic Science)

Presentation materials

There are no materials yet.