Description

The SHINE project requires more than six hundred 1.3GHz cavities and sixteen 3.9GHz cavities for the superconducting accelerator. These cavities are from both domestic and foreign companies. The cavities fabricated in domestic companies requires correspond-ing capacity of surface-treatment. For the R&D of surface-treatment technology and mass production of SRF cavities, we have been constructing a new surface-treatment platform near Shanghai for SHINE project. In this paper, we report the design, construction, commissioning and operation of this platform.

Region represented Asia

Primary author

Jinfang Chen (Shanghai Advanced Research Institute)

Co-authors

Changhao Cheng (Shanghai Advanced Research Institute) Chengcheng Xiao (Shanghai Synchrotron Radiation Facility) Dong Wang (Shanghai Advanced Research Institute) Guoqiang Lin (Shanghai Institute of Applied Physics) Hong Tao Hou (Shanghai Advanced Research Institute) Jian Rong (Shanghai Synchrotron Radiation Facility) Jiani Wu (Shanghai Advanced Research Institute) Shuai Xing (Shanghai Advanced Research Institute) Xiaowei Wu (Zhangjiang Lab) Xiaoyun Pu (Shanghai Institute of Applied Physics) Xuhao He (ShanghaiTech University) Yawei Huang (ShanghaiTech University) Yeliang Zhao (Shanghai Advanced Research Institute) Yue Zong (Shanghai Institute of Applied Physics) Zheng Wang (Shanghai Institute of Applied Physics) lixin Yin (Shanghai Advanced Research Institute) pengcheng dong (Shanghai Advanced Research Institute)