7–12 May 2023
Venice, Italy
Europe/Zurich timezone

LLRF control upgrade at BESSY-II with mTCA.4 platforms

THPL045
11 May 2023, 16:30
2h
Sala Laguna

Sala Laguna

Poster Presentation MC6.T27: Low Level RF Thursday Poster Session

Speaker

Andriy Ushakov (Helmholtz-Zentrum Berlin für Materialien und Energie GmbH)

Description

The synchrotron light source BESSY-II has been in operation for almost 25 years and modernization measures are needed to maintain competitiveness until its successor BESSY-III comes online. One measure is to replace the old analogue LLRF control units with new, state of the art mTCA.4-based digital ones. The so-called “single cavity” firmware developed by DESY is being used together with the ChimeraTK adapter to connect the mTCA to the EPICS control system. A pair of SIS8300KU and a DWC8VM is used, while the tuner is driven by a PhyMotion chassis connected to the EPICS system. We discuss the implementation of the system.

I have read and accept the Privacy Policy Statement Yes

Primary author

Pablo Echevarria (Helmholtz-Zentrum Berlin für Materialien und Energie GmbH)

Co-authors

Alex Sayalero (Helmholtz-Zentrum Berlin fuer Materialien und Energie GmbH (HZB)) Andriy Ushakov (Helmholtz-Zentrum Berlin für Materialien und Energie GmbH) Axel Neumann (Helmholtz-Zentrum Berlin für Materialien und Energie GmbH) Bernhard Kuner (Berliner Elektronenspeichering-Gesellschaft für Synchrotronstrahlung m.b.H.) Jens Knobloch (University of Siegen) Tobias Loewner (Helmholtz-Zentrum Berlin)

Presentation materials

There are no materials yet.