Description
QWR cavities are prepared for beam commissioning. RF conditioning is performed for each QWR cavity. The total heat load including static and dynamic heat loads are measured for each cavity. The helium pressure fluctuation is reduced by changing the flow rate, supply pressure, return pressure, liquid helium level in reservoir, cryogenic valve control, etc. The cavity pressure is monitored during RF preparation. The amplitude and phase of the QWR cavity are stably controlled for beam commissioning.
I have read and accept the Privacy Policy Statement | Yes |
---|
Primary author
Heetae Kim
(Institute for Basic Science)
Co-authors
Danhye Gil
(Institute for Basic Science)
Hyojae Jang
(Institute for Basic Science)
Juwan Kim
(Institute for Basic Science)
Ki Taek Son
(Institute for Basic Science)
Min Ki Lee
(Institute for Basic Science)
Sungmin Jeon
(Kyungpook National University)
Taekyung KI
(Institute for Basic Science)
Yoochul Jung
(Institute for Basic Science)
Youngkwon Kim
(Institute for Basic Science)