Cyclone® IKON : From commissioning to operation

TUP44
Not scheduled
20m
InterContinental Chengdu Global Center

InterContinental Chengdu Global Center

Chengdu, China
Poster Presentation Cyclotron for Hadron Therapy and Isotope Production Poster Section

Speaker

Erik van der Kraaij (Ion Beam Applications (Belgium))

Description

At the CYC2022 conference, IBA presented its new 30 MeV proton accelerator. The first installation of this Cyclone® IKON, with four beam transmission lines and a beam energy of 30 down to 13 MeV, has now successfully been commissioned and is running at a customer site.
In this presentation we will go into the details of the accelerator’s performance, from its injection to its transmission, plus intensity on targets. With the accelerator fully operational, we will also present a comparison of the latest results with the design and commissioning simulations.

Authors

Erik van der Kraaij (Ion Beam Applications (Belgium)) Mr Michel Abs (Ion Beam Applications (Belgium)) Jean-Michel Geets (Ion Beam Applications (Belgium)) Jerome Mandrillon (Ion Beam Applications (Belgium)) Mr Olivier Michaux (Ion Beam Applications (Belgium)) Mr Vincent Nuttens (Ion Beam Applications (Belgium)) Mr Patrick Verbruggen (Ion Beam Applications (Belgium))