27–31 Oct 2025
InterContinental Chengdu Global Center
Asia/Shanghai timezone
The submission portal for presentation materials and papers is now open. Please submit your full paper before October 29.

Upgrades On The Cyclotron Injection Line at SPES Facility at LNL

MOP46
Not scheduled
20m
InterContinental Chengdu Global Center

InterContinental Chengdu Global Center

Chengdu, China
Poster Presentation Cyclotron and Technology Poster Section

Speaker

Piergiorgio Antonini (Istituto Nazionale di Fisica Nucleare)

Description

The 70 MeV cyclotron in use at Laboratori Nazionali di Legnaro at INFN was designed to deliver proton current up to 0.75 mA. Being designed as a relatively high current cyclotron, little attention was dedicated to the possibility to operate at low currents in the order of few tens of nA. On the other side, it is very interesting to try to increase the deliverable current near or above the 1 mA range.
Experiments planned at the SPES facility require operation at low currents. To be able to operate at such currents in a fail safe mode, a chopper is being designed for the injection line.
To increase the current, on the other hand, a beam buncher is being designed for the injection line.
Beam dynamics simulations and both mechanical and electronics design will be discussed.

Author

Piergiorgio Antonini (Istituto Nazionale di Fisica Nucleare)

Co-authors

Mario Maggiore (Istituto Nazionale di Fisica Nucleare) Lorenzo Pranovi (Istituto Nazionale di Fisica Nucleare) Arturo Abbondanza (Istituto Nazionale di Fisica Nucleare, Laboratori Nazionali di Legnaro, University of Ferrara) Alberto Ruzzon (Istituto Nazionale di Fisica Nucleare)

Presentation materials

There are no materials yet.