17–22 May 2026
C.I.D
Europe/Zurich timezone

Accelerator upgrades required for beam operation at Fermilab in the PIP-II/DUNE era

WEP4306
20 May 2026, 16:00
2h
C.I.D

C.I.D

Deauville, France
Poster Presentation MC4.A04: Hadron accelerators: Circular Accelerators Poster session

Speaker

Srinivas Krishnagopal (Fermi National Accelerator Laboratory)

Description

The Proton Improvement Plan - II (PIP-II) injector linac is an 800 MeV superconducting H- linac that will replace the existing 400 MeV injector to the accelerator complex at Fermilab. The higher energy, intensity and repetition rate require various upgrades to the existing accelerator complex consisting of the Booster, the Recycler Ring and the Main Injector, in order to be able to accept and accelerate beam from PIP-II. In this paper we discuss the various upgrades that are required and steps being taken to implement them.

In which format do you inted to submit your paper? LaTeX

Author

Srinivas Krishnagopal (Fermi National Accelerator Laboratory)

Co-authors

Joseph Dey (Fermi National Accelerator Laboratory) Mary Convery (Fermi National Accelerator Laboratory)

Presentation materials

There are no materials yet.