Speaker
Srinivas Krishnagopal
(Fermi National Accelerator Laboratory)
Description
The Proton Improvement Plan - II (PIP-II) injector linac is an 800 MeV superconducting H- linac that will replace the existing 400 MeV injector to the accelerator complex at Fermilab. The higher energy, intensity and repetition rate require various upgrades to the existing accelerator complex consisting of the Booster, the Recycler Ring and the Main Injector, in order to be able to accept and accelerate beam from PIP-II. In this paper we discuss the various upgrades that are required and steps being taken to implement them.
| In which format do you inted to submit your paper? | LaTeX |
|---|
Author
Srinivas Krishnagopal
(Fermi National Accelerator Laboratory)
Co-authors
Joseph Dey
(Fermi National Accelerator Laboratory)
Mary Convery
(Fermi National Accelerator Laboratory)