Speaker
Kyle Hazelwood
(Fermi National Accelerator Laboratory)
Description
In June 2024, the Fermilab Main Injector recorded its greatest one hour average beam power delivered to NuMI. The record 1.018 MW power was the culmination of years of work, involving upgrades to various systems to allow for greater beam intensity, better loss control and faster ramping of the machine. Following the record achievement, the Main Injector complex suffered a series of failures that have prevented NuMI beam. This paper will discuss the beam power record, Main Injector's recovery efforts, and future plans for even higher beam power.
| Paper status | Resubmitted proceeding files received and assigned to an editor. Ready for Review. |
|---|
Author
Kyle Hazelwood
(Fermi National Accelerator Laboratory)
Co-authors
Adam Schreckenberger
(Fermi National Accelerator Laboratory)
Bruce Brown
(Fermi National Accelerator Laboratory)
Cristhian Gonzalez-Ortiz
(Fermi National Accelerator Laboratory)
David Capista
(Fermi National Accelerator Laboratory)
Denton Morris
(Fermi National Accelerator Laboratory)
Dr
Ioanis Kourbanis
(Fermi National Accelerator Laboratory)
Kit Danison-Fieldhouse
(Fermi National Accelerator Laboratory)
Martin Murphy
(Fermi National Accelerator Laboratory)
Dr
Meiqin Xiao
(Fermi National Accelerator Laboratory)
Michael Olander
(Fermi National Accelerator Laboratory)
Mr
Michael Wren
(Fermi National Accelerator Laboratory)
Ming-Jen Yang
(Fermi National Accelerator Laboratory)
Phil Adamson
(Fermi National Accelerator Laboratory)
Robert Ainsworth
(Fermi National Accelerator Laboratory)