17–22 May 2026
C.I.D
Europe/Zurich timezone

Beam positions monitors for PERLE

WEP6036
20 May 2026, 16:00
2h
C.I.D

C.I.D

Deauville, France
Poster Presentation MC6.T03: Beam Diagnostics and Instrumentation Poster session

Speaker

Dr Mohammed Ben Abdillah (Université Paris-Saclay, CNRS/IN2P3, IJCLab)

Description

PERLE is an Energy-Recovery Linac (ERL) to be constructed at IJCLab in Orsay. It will be the First ever multi-turn ERL with superconducting RF (SRF) acceleration, and the first ERL with the ambition to reach 5MW beam operation. Diagnostics are a key element for PERLE operation and among diagnostics, Beam position monitors (BPMs) cover a wide range of applications. in this worl we report BPM goals for a proper operation of PERLE, it also details the design of BPM detectors and eludes the steps for their realization. it finally emphasizes the design of BPM electronics to match the presence of multiple beams which need to be individually diagnosed and controlled.

In which format do you inted to submit your paper? Word

Author

Dr Mohammed Ben Abdillah (Université Paris-Saclay, CNRS/IN2P3, IJCLab)

Presentation materials

There are no materials yet.