Speaker
Vladimir Nagaslaev
(Fermi National Accelerator Laboratory)
Description
Following the successful completion of the Muon g-2 experiment run at Fermilab, the Muon Campus facili-ty has been reconfigured from delivering 3 GeV muon beams to the g-2 storage ring to providing slow-extracted 8 GeV proton beam spills for the Mu2e ex-periment. The first full-scale commissioning run with slow extraction was conducted during the 2025 run, followed by the second run in early 2026. We present the results and current status of this commissioning campaign.
| Paper status | Proceeding files received |
|---|
Author
Vladimir Nagaslaev
(Fermi National Accelerator Laboratory)