17–22 May 2026
C.I.D
Europe/Zurich timezone

Construction Status of the NEWGAIN RFQ

THP4015
21 May 2026, 16:00
2h
C.I.D

C.I.D

Deauville, France
Poster Presentation MC4.A08: Hadron accelerators: Linear Accelerators Poster session

Speaker

Mr Alexandre Deville (Commissariat à l'Énergie Atomique et aux Énergies Alternatives)

Description

A new injector called NEWGAIN will be added to the SPIRAL2 Linear Accelerator in parallel with the existing one. It will be mainly composed of an ion source and a Radio Frequency Quadrupole (RFQ) connected to the superconductive LINAC. The RFQ is a standard four-vane bulk copper cavity, composed of 7 segments of about 1m. The new RFQ will accelerate at 88.05MHz particles with charge-over-mass ratio (Q/A) between 1/3 and 1/7, from 10 keV/u up to 590 keV/u. This paper will present the status of the RFQ section fabrication and its necessary support systems. The fabrication and delivery of these components will lead to its installation, which is a major milestone for the project.

In which format do you inted to submit your paper? Word
Preprint marking on your proceeding paper I do not wish my paper to be marked as preprint.

Authors

Mr Alexandre Deville (Commissariat à l'Énergie Atomique et aux Énergies Alternatives) Augustin DUBOIS (Commissariat à l'Energie Atomique) Maryam Oublaid (Commissariat à l'Énergie Atomique et aux Énergies Alternatives) Olivier Piquet (CEA Paris-Saclay) Mr Olivier Tellier (Commissariat à l'Énergie Atomique et aux Énergies Alternatives) Pierrick Hamel (Commissariat à l'Energie Atomique) Mr Stéphane Jurié (Commissariat à l'Énergie Atomique et aux Énergies Alternatives) Mr Vincent Hennion (Commissariat à l'Énergie Atomique et aux Énergies Alternatives) Ms lexane picault (Commissariat à l'Énergie Atomique et aux Énergies Alternatives)

Presentation materials

There are no materials yet.