Since the last installation campaign, additional High-Beta (HB) cryomodules (CM) have been tested and qualified Ready-for-Installation (RFI) at the ESS Test Stand. Their installation was planned for the summer’25, right after the first Beam On Dump (BOD) commissioning phase and a complete warm-up of the accelerator. The number of HB CM has raised to 11 out of 21 allowing for a potential maximum power of the Linac of 3 MW. This paper will present the lessons learned from the previous phase as well as the necessary measures taken in order to install 6 cryomodules in a RP controlled area in only 3 months.