17–22 May 2026
C.I.D
Europe/Zurich timezone

Additional installation effort for the 3MW readiness at ESS

MOP7037
18 May 2026, 16:00
2h
C.I.D

C.I.D

Deauville, France
Poster Presentation MC7.T07: Superconducting RF Poster session

Speaker

Mr Artur Krawczyk (European Spallation Source)

Description

Since the last installation campaign, additional High-Beta (HB) cryomodules (CM) have been tested and qualified Ready-for-Installation (RFI) at the ESS Test Stand. Their installation was planned for the summer’25, right after the first Beam On Dump (BOD) commissioning phase and a complete warm-up of the accelerator. The number of HB CM has raised to 11 out of 21 allowing for a potential maximum power of the Linac of 3 MW. This paper will present the lessons learned from the previous phase as well as the necessary measures taken in order to install 6 cryomodules in a RP controlled area in only 3 months.

In which format do you inted to submit your paper? LaTeX

Author

Henry Przybilski (European Spallation Source)

Co-author

Mr Artur Krawczyk (European Spallation Source)

Presentation materials

There are no materials yet.