Speaker
Description
The accelerator complex for the Facility for Antiproton and Ion Research (FAIR) is currently being built in Darmstadt, Germany. After the arrival of the cold box for the central cryogenic facility (CRYO2) in winter 2023, the installation of the accelerator components in the machine and supply tunnels started early 2024. Meanwhile the installation has moved forward. CRYO2 has been handed over to the commissioning team and the commissioning is in progress. The accelerator installation is ongoing in all parts of the beamlines of the High Energy Beam Transfer Lines (HEBT), the Super Fragment Separator (SFRS) and the Heavy Ion Synchrotron (SIS100). In parallel, the installation plans for the experiments (NUSTAR and CBM) are being developed and installation preparations are taking place. In this paper the status and challenges of the machine installation in those areas are presented and an outlook for the next steps towards realisation of the project phases for Early and First Science is given.
| In which format do you inted to submit your paper? | LaTeX |
|---|