17–22 May 2026
C.I.D
Europe/Zurich timezone

High Charge Operation and Future Upgrades of the APS-U Injector Chain

19 May 2026, 15:00
20m
C.I.D

C.I.D

Deauville, France
Contributed Oral Presentation MC2.A05: Synchrotron Radiation Facilities MC2 : Photon Sources and Electron Accelerators

Speaker

Joseph Calvey (Argonne National Laboratory)

Description

For swap-out operation in the APS-Upgrade storage ring, the injector must supply a full charge bunch in one shot. For 200 mA operation in 48 bunch timing mode, the required charge per bunch is 16 nC, which is challenging for the injector chain. In this paper we report on the present status of high charge operation and discuss upcoming improvements to increase the charge limit. We also propose two future upgrades to the APS-U injector chain: a high charge photoinjector for direct injection into the booster, and a high energy accumulator ring in the booster tunnel.

Funding Agency

Work supported by the U.S. Department of Energy, Office of Science, under Contract No. DE-ACO2-O6CH11357

In which format do you inted to submit your paper? LaTeX

Author

Joseph Calvey (Argonne National Laboratory)

Co-authors

Kent Wootton (Argonne National Laboratory) Michael Borland (Argonne National Laboratory) Osama Mohsen (Argonne National Laboratory) Ran Hong (Argonne National Laboratory) Tim Berenc (Argonne National Laboratory) Yine Sun (Argonne National Laboratory)

Presentation materials

There are no materials yet.