19–24 May 2024
Music City Center
US/Central timezone

Session

WEBN: Beam Instrumentation, Controls, Feedback and Operational Aspects (Contributed)

WEBN
22 May 2024, 11:30
Music City Center

Music City Center

201 Rep. John Lewis Way S, Nashville, TN 37203, USA

Conveners

WEBN: Beam Instrumentation, Controls, Feedback and Operational Aspects (Contributed)

  • Alexander Aleksandrov (Oak Ridge National Laboratory)

Presentation materials

There are no materials yet.
Alexander Romanov (Fermi National Accelerator Laboratory)
22/05/2024, 11:30
MC6.T03 Beam Diagnostics and Instrumentation
Contributed Oral Presentation

We present the results of the first experiments on 6-dimensional phase-space tracking of a single electron in a storage ring, using a linear multi-anode photomultiplier tube for simultaneously measuring transverse coordinates and arrival times of synchrotron-radiation pulses. This technology makes it possible to fully reconstruct turn-by-turn positions and momentums in all three planes for a...

Nicole Neveu (SLAC National Accelerator Laboratory)
22/05/2024, 11:50
MC6.T03 Beam Diagnostics and Instrumentation
Contributed Oral Presentation

LCLS-II commissioning is well under way. As an indirect diagnostic, electron beam-induced higher order mode (HOM) signals from the RF cavities in the first LCLS-II cryomodule are routed outside the accelerator and filtered to select dipole modes. The signals are amplified and detected using a Schottky diode, following a design tested at Fermilab. The detected signal magnitude is proportional...

John Heron (European Organization for Nuclear Research)
22/05/2024, 12:10
MC6.T22 Reliability, Operability
Contributed Oral Presentation

The FCC-ee is CERN's leading proposal for the next generation of energy-frontier particle accelerators. To reach integrated luminosity goals, it must be operational for minimum 80% of the scheduled 185 physics days each year. For comparison, the LHC* achieved 77% in Run 2, 2016-2018. There are additional challenges in operation and maintenance of the FCC-ee due to its scale, complexity and...

Building timetable...