19–24 May 2024
Music City Center
US/Central timezone

Machine interlock system for accelerator section in PAL-XFEL

MOPC46
20 May 2024, 16:00
2h
Country (MCC Exhibit Hall A)

Country

MCC Exhibit Hall A

Poster Presentation MC1.A08 Linear Accelerators Monday Poster Session

Speaker

YoungJin Suh (Pohang Accelerator Laboratory)

Description

Laser, MPS, Modulator, Vacuum, LLRF, etc. are installed at the Pohang Accelerator Laboratory-XFEL linac section. Each device must be protected against emergency situations. When an interlock signal occurs in the XFEL linac section of Pohang Accelerator Research Institute, the beam shutter is closed using the PLC and the operation of each device is blocked. We used an Emerson PLC and connected the interlock signal to each device with a cable to the terminal block.
The operating status of devices required for accelerator operation is displayed on the driver's cabin HMI, providing the driver with the information necessary for accelerator operation, and storing changed status data in real time. If the MIS is abnormal, beam operation is impossible, so the CPU and communication are each configured as redundant.

Region represented Asia
Paper preparation format Word

Primary author

YoungJin Suh (Pohang Accelerator Laboratory)

Co-authors

Byoung Ryul Park (Pohang Accelerator Laboratory) DongCheol Shin (Pohang Accelerator Laboratory) Geonyeong Mun (Pohang Accelerator Laboratory) Hoon Heo (Pohang Accelerator Laboratory) Inhyuk Nam (Pohang Accelerator Laboratory) Soung Youl Baek (Pohang Accelerator Laboratory)

Presentation materials

There are no materials yet.