Speaker
Fani Valchkova-Georgieva
(CEGELEC SA (Actemium Geneve))
Description
Following the study progress on the FCC-ee radiofrequency systems (i.e. length of the cryomodules), general services infrastructure (i.e. electrical, cooling, ventilation), transport and handling volumes, and alignment requirements, the 3D integration evolved with a new configuration scenario. This paper describes the new proposal to locate the collider RF elements (400 MHz and 800 MHz cryomodules) at point H, and the booster RF elements (800 MHz cryomodules) at point L, without changing the 5.5 m inner diameter tunnel.
Region represented | Europe |
---|
Primary author
Fani Valchkova-Georgieva
(CEGELEC SA (Actemium Geneve))
Co-authors
Olivier Brunner
(European Organization for Nuclear Research)
Jean-Paul Burnet
(European Organization for Nuclear Research)
Julie Coupard
(European Organization for Nuclear Research)
Klaus Hanke
(European Organization for Nuclear Research)
Vittorio Parma
(European Organization for Nuclear Research)
Franck Peauger
(European Organization for Nuclear Research)