19–24 May 2024
Music City Center
US/Central timezone

Status and plans for the upgrade of the PETRA IV RF system

TUPG15
21 May 2024, 16:00
2h
Bluegrass (MCC Exhibit Hall A)

Bluegrass

MCC Exhibit Hall A

Poster Presentation MC2.A05 Synchrotron Radiation Facilities Tuesday Poster Session

Speaker

Nils-Oliver Fröhlich (Deutsches Elektronen-Synchrotron)

Description

In the framework of the planned upgrade of PETRA III to the fourth-generation light source PETRA IV at DESY, it is necessary to replace the more than forty-year-old RF system with state-of-the-art components to suppress coupled-bunch instabilities caused by parasitic higher-order modes (HOM). The plan is to install single-cell normal-conducting HOM-damped cavities, each driven by a high-power solid-state amplifier (SSA) at the fundamental frequency of 500 MHz. In order to suppress the negative effects of Touschek and intrabeam scattering, a third harmonic system is foreseen which lengthens the bunches and reduces their charge density. The RF system will be controlled by a low-level RF system based on the microTCA platform. In 2023, a prototype of the fundamental RF system was installed in PETRA III, which contains a HOM-damped cavity driven by a 120 kW SSA that can be operated in parallel with the existing RF system. This paper describes the planned design of the PETRA IV RF system and reports on the first results of the performance of the fundamental prototype system with beam.

Region represented Europe
Paper preparation format LaTeX

Primary author

Nils-Oliver Fröhlich (Deutsches Elektronen-Synchrotron)

Co-authors

Chris Christou (Diamond Light Source Ltd) Peter Hülsmann (Deutsches Elektronen-Synchrotron) Ruediger Onken (Deutsches Elektronen-Synchrotron)

Presentation materials

There are no materials yet.