19–24 May 2024
Music City Center
US/Central timezone

3rd harmonic active EU-HOM damped cavity commissioning results

TUPG03
21 May 2024, 16:00
2h
Bluegrass (MCC Exhibit Hall A)

Bluegrass

MCC Exhibit Hall A

Poster Presentation MC2.A05 Synchrotron Radiation Facilities Tuesday Poster Session

Speaker

Jesus Ocampo (ALBA-CELLS Synchrotron)

Description

A collaboration agreement between the ALBA, DESY and HZB institutions was signed on 2021 in order to commission the 3rd harmonic normal conducting, HOM damped, active cavity designed and prototyped by ALBA. The cavity prototype arrived to ALBA in December 2021, and successfully passed the low power RF and vacuum tests. Afterwards, in January 2022 it was sent to HZB and mounted in the SUPRALAB@HZB, in the HoBiCat bunker for bead-pull measurements and high-power conditioning. Finally, in May 2022 the cavity was installed in the BESSY-II ring for test with beam. In this contribution we summarize and highlight the major results after two years of commissioning with beam including the lengthening capability of the cavity for single bunch and homogeneous filling pattern, lifetime increase measurements, HOM damping capability and transient beam loading effects due to the presence of a gap in the filling pattern.

Region represented Europe
Paper preparation format LaTeX

Primary author

Francis Perez (ALBA-CELLS Synchrotron)

Co-authors

Alexander Matveenko (Helmholtz-Zentrum Berlin für Materialien und Energie GmbH) Ignasi Bellafont (ALBA-CELLS Synchrotron) Jesus Ocampo (ALBA-CELLS Synchrotron) Markus Ries (Helmholtz-Zentrum Berlin für Materialien und Energie GmbH) Nils-Oliver Fröhlich (Deutsches Elektronen-Synchrotron) Peter Hülsmann (Deutsches Elektronen-Synchrotron) Mr Pol Solans (ALBA-CELLS Synchrotron) Ruediger Onken (Deutsches Elektronen-Synchrotron) Tobias Loewner (Helmholtz-Zentrum Berlin fuer Materialien und Energie GmbH)

Presentation materials

There are no materials yet.