Speaker
Jiangyan Yang
(GSI Helmholtzzentrum für Schwerionenforschung GmbH)
Description
Slowly extracted beams from a synchrotron have temporal fluctuations, the so-called spill micro structure. The reason is related to power supply ripples that act on the quadrupole magnets, leading to unintended tune fluctuations during extraction. Related simulations regarding the dependency of spill quality on the power supply ripples are executed with varying excitation levels of the sinusoidal ripples and bandwidth-limited white noise. In addition, transit time spread is simulated, a few simulation approaches are proposed, and related data analysis procedures and preliminary results are described.
Funding Agency
This project has received funding from the European Union’s Horizon 2020 Research and Innovation programme under GA No 101004730.
I have read and accept the Privacy Policy Statement | Yes |
---|
Primary authors
Jiangyan Yang
(GSI Helmholtzzentrum für Schwerionenforschung GmbH)
Peter Forck
(GSI Helmholtzzentrum für Schwerionenforschung GmbH)
Rahul Singh
(GSI Helmholtzzentrum für Schwerionenforschung GmbH)
Stefan Sorge
(GSI Helmholtzzentrum für Schwerionenforschung GmbH)