Speaker
Bryan Jones
(European Spallation Source ERIC)
Description
The European Spallation Source (ESS) aims to build and commission a 2 MW proton linac ready for neutron production in 2025. Commissioning of the normal conducting section of the linac is underway and previous papers have reported the performance of the microwave-discharge ion source, Radio Frequency Quadrupole (RFQ) and first Drift Tube Linac (DTL) tank.
This paper describes the recent assembly, installation, testing and commissioning of an additional threee DTL tanks as well as developments of supporting systems such as RF feedback, control system tools and operating procedures.
I have read and accept the Privacy Policy Statement | Yes |
---|
Primary author
Bryan Jones
(European Spallation Source ERIC)
Co-author
Francesco Grespan
(Istituto Nazionale di Fisica Nucleare)