7–12 May 2023
Venice, Italy
Europe/Zurich timezone

Construction, assembly and measurements of the SPES RFQ

TUPL128
9 May 2023, 16:30
2h
Sala Laguna

Sala Laguna

Poster Presentation MC2.A08: Linear Accelerators Tuesday Poster Session

Speaker

Antonio Palmieri (Istituto Nazionale di Fisica Nucleare)

Description

The SPES RFQ is designed in order to accelerate beams
in CW with A/q ratios from 3 to 7 from the Charge Breeder
through the MRMS and the selection and injection lines up
to the MEBT (Medium Energy Beam Transport). The RFQ
is composed of 6 modules about 1.2 m long each, made of a Stainless Steel Tank and
four OFE Copper Electrodes. A copper layer is plated on
the tank inner surface and a spring joint between tank and
electrode is used in order to seal the RF. In this article, the main results related to the the module assembly and related RF and mechanical measurements
are shown.

I have read and accept the Privacy Policy Statement Yes

Primary authors

Loris Antoniazzi (Istituto Nazionale di Fisica Nucleare) Enrico Fagotti (Istituto Nazionale di Fisica Nucleare) Luigi Ferrari (Istituto Nazionale di Fisica Nucleare) Antonio Palmieri (Istituto Nazionale di Fisica Nucleare) Andrea Pisent (Istituto Nazionale di Fisica Nucleare)

Presentation materials

There are no materials yet.