7–12 May 2023
Venice, Italy
Europe/Zurich timezone

Preliminary design of control system for storage ring RF in Korea 4GSR

MOPA079
8 May 2023, 16:30
2h
Salone Adriatico

Salone Adriatico

Poster Presentation MC1.A24: Accelerators and Storage Rings, Other Monday Poster Session

Speakers

MUJIN LEE (Pohang Accelerator Laboratory)Dr Bong Hyuk Choi (Pohang Accelerator Laboratory)

Description

The Korea 4th Generation Storage Ring(Korea-4GSR) project has been launched in 2022. The Korea 4GSR aims to generate the ultra-low emittance beam with the beam current of 400 mA and the beam energy of 4 GeV. In order to accelerate and store the beam to desired parameter, the Storage Ring RF(SRRF) is composed of 10 or more RF Stations and each RF Station includes LLRF(Low Level RF), HPRF(High Power RF), NCC(Normal Conducting Cavity) system.
For stable operation and machine safety, sub systems are operated by the Control System for the SRRF. In this paper, we describe the design of the Control System. It will include control network, operating interface, emergency interlock, data archiving and so on.

I have read and accept the Privacy Policy Statement Yes

Primary author

MUJIN LEE (Pohang Accelerator Laboratory)

Co-authors

Dr Bong Hyuk Choi (Pohang Accelerator Laboratory) Youngdo Joo (Pohang Accelerator Laboratory) Junghoon KIM (Pohang Accelerator Laboratory) Yong-Seok Lee (Pohang Accelerator Laboratory) In Soo Park (Pohang Accelerator Laboratory) Sehwan Park (Pohang Accelerator Laboratory) Younguk Sohn (Pohang Accelerator Laboratory)

Presentation materials

There are no materials yet.