7–12 May 2023
Venice, Italy
Europe/Zurich timezone

Session

MC08.1 - Applications of Accelerators, Technology Transfer and Industrial Relations and Outreach (Contributed)

WEODA
10 May 2023, 09:30
Venice, Italy

Venice, Italy

Lungomare Marconi 1861 30126 Lido di Venezia Italy

Conveners

MC08.1 - Applications of Accelerators, Technology Transfer and Industrial Relations and Outreach (Contributed)

  • Sandra Biedron (University of New Mexico)

Presentation materials

There are no materials yet.
Philip Burrows (John Adams Institute)
10/05/2023, 09:30
MC8.U10: Outreach and Communications
Contributed Oral Presentation

The I.FAST CBI is an immersive challenge-based innovation program funded by the H2020 I.FAST project. The 10-day face-to-face challenge brings together students of different disciplines from all over Europe to work together on innovative projects using accelerator technology applied to environmental challenges. We report on the first edition of the I.FAST CBI, the proposed projects and...

Francesco Schillaci (ELI Beamlines Czech Republic)
10/05/2023, 09:50
MC3.A15: New Acceleration Techniques
Contributed Oral Presentation

In this contribution we report on the commissioning of the ELIMAIA beamline laser-plasma Ion Accelerator carried out with the high repetition-rate, high peak-power L3-HAPLS (>10J in 30 fs) laser available at the ELI Beamlines user facility. The optimization process to achieve a stable energy cutoff exceeding 30MeV with high proton fluxes will be described providing an overview of the available...

Andrey Zelinsky (National Science Centre)
10/05/2023, 10:10
MC8.U03: Transmutation and Energy Production
Contributed Oral Presentation

To ensure physical start up of NSC KIPT SCA Neutron Source, 100 MeV/ 100 kW electron linear accelerator should provide stable operation mode with 100 MeV electron beam energy, 20 Hz repetition rate, 35-40 mA pulse beam current, ± 3 beam energy spread and about ± 3 mm beam sizes. During preparations to the facility start up the required beam parameters were adjusted and secured during the SCA...