7–12 May 2023
Venice, Italy
Europe/Zurich timezone

Status of the ESS normal conducting linac including beam commissioning to DTL4

TUPA178
9 May 2023, 16:30
2h
Salone Adriatico

Salone Adriatico

Poster Presentation MC4.A08: Linear Accelerators Tuesday Poster Session

Speaker

Bryan Jones (European Spallation Source ERIC)

Description

The European Spallation Source (ESS) aims to build and commission a 2 MW proton linac ready for neutron production in 2025. Commissioning of the normal conducting section of the linac is underway and previous papers have reported the performance of the microwave-discharge ion source, Radio Frequency Quadrupole (RFQ) and first Drift Tube Linac (DTL) tank.
This paper describes the recent assembly, installation, testing and commissioning of an additional threee DTL tanks as well as developments of supporting systems such as RF feedback, control system tools and operating procedures.

I have read and accept the Privacy Policy Statement Yes

Primary author

Bryan Jones (European Spallation Source ERIC)

Co-author

Francesco Grespan (Istituto Nazionale di Fisica Nucleare)

Presentation materials

There are no materials yet.