May 7 – 12, 2023
Venice, Italy
Europe/Zurich timezone

Design optimization for the construction of a linear accelerator driven BNCT facility

MOPL132
May 8, 2023, 4:30 PM
2h
Sala Laguna

Sala Laguna

Poster Presentation MC1.A08: Linear Accelerators Monday Poster Session

Speaker

Andrea Pisent (Istituto Nazionale di Fisica Nucleare)

Description

A Boron Neutron Capture Therapy facility requires a high flux of neutrons (approx. 10^9 thermal or epithermal n/s*cm^2) with low contamination content (gamma and off energy neutrons). The core of such a facility is a low energy high intensity proton linac, coupled with a high power beryllium neutron production target, followed by a proper Beam Shaping System. In this paper we shall discuss various aspects of the optimization of this system, on the bases of the R&D results available in view of the construction of a high performance BNCT facility in Italy.

I have read and accept the Privacy Policy Statement Yes

Primary authors

Andrea Pisent (Istituto Nazionale di Fisica Nucleare) Enrico Fagotti (Istituto Nazionale di Fisica Nucleare) Antonio Palmieri (Istituto Nazionale di Fisica Nucleare) Francesco Grespan (European Spallation Source ERIC) Michele Comunian (Istituto Nazionale di Fisica Nucleare) Carlo Baltador (Istituto Nazionale di Fisica Nucleare) Luca Bellan (Istituto Nazionale di Fisica Nucleare) Valerio Vercesi (Istituto Nazionale di Fisica Nucleare) Paolo Mereu (Istituto Nazionale di Fisica Nucleare) Valeria Conte (Istituto Nazionale di Fisica Nucleare) Silva Bortolussi (Istituto Nazionale di Fisica Nucleare) Anna Selva (Istituto Nazionale di Fisica Nucleare)

Presentation materials

There are no materials yet.