10–15 Aug 2025
SAFE Credit Union Convention Center
America/Los_Angeles timezone

Session

Beam Instrumentation, Controls, AI/ML, and Operational Aspects (Contributed)

THAN
14 Aug 2025, 09:30
SAFE Credit Union Convention Center

SAFE Credit Union Convention Center

1401 K St, Sacramento, CA 95814

Presentation materials

There are no materials yet.
Sudeshna Ganguly (Fermi National Accelerator Laboratory)
14/08/2025, 09:30
MC6 - Beam Instrumentation, Controls, AI/ML, and Operational Aspects
Contributed Oral Presentation

The Long Baseline Neutrino Facility (LBNF) at Fermilab will deliver a high-intensity, multi-megawatt neutrino beam to the Deep Underground Neutrino Experiment (DUNE), enabling precision tests of the three-neutrino paradigm, CP violation searches, neutrino mass ordering determination, and supernova neutrino studies. To accelerate DUNE’s physics reach and ensure robust beam operations, we...

Nikita Kuklev (Fermi National Accelerator Laboratory)
14/08/2025, 09:50
MC6 - Beam Instrumentation, Controls, AI/ML, and Operational Aspects
Contributed Oral Presentation

To meet PIP-II upgrade requirements, Fermilab Booster losses need to be reduced by 50\% compared to present levels. So far, simulations are not good enough to predict loss patterns. Thus, an extensive Booster tune up will be necessary to achieve required performance. In this paper we present an effort to build a data-driven loss model using Bayesian techniques, and subsequently to rebalance...

Prof. Andreas Penirschke (Technische Hochschule Mittelhessen)
14/08/2025, 10:10
MC6 - Beam Instrumentation, Controls, AI/ML, and Operational Aspects
Contributed Oral Presentation

This work presents advancements in precision longitudinal beam diagnostics for Free Electron Lasers (FELs), integrating zero-bias Schottky-diode-based THz detectors and upgraded electro-optical bunch arrival-time monitors (EO-BAMs) for low-charge operation. The developed THz detector achieves ps-scale response times and 70 GHz intermediate-frequency bandwidth, enabling single-shot THz...

Building timetable...