10–15 Aug 2025
SAFE Credit Union Convention Center
America/Los_Angeles timezone

The control and monitoring system for the APS-U front-end XBPM*

Not scheduled
20m
SAFE Credit Union Convention Center

SAFE Credit Union Convention Center

1401 K St, Sacramento, CA 95814
Poster Presentation MC6 - Beam Instrumentation, Controls, AI/ML, and Operational Aspects MC6

Speaker

Shifu Xu (Argonne National Laboratory)

Description

The Advanced Photon Source Upgrade (APS-U) project aims to enhance the performance and capabilities of the APS, delivering brighter and more coherent x-ray beams to support cutting-edge scientific research. A critical component of this upgrade is the front-end X-ray Beam Position Monitor (XBPM) system, which plays a vital role in ensuring beam stability and precision. This paper presents the design and implementation of the control and monitoring system for the APS-U front-end XBPM. The system integrates advanced hardware and software solutions to achieve real-time monitoring of x-ray beam position. Key features include high-resolution data acquisition, robust signal processing algorithms, and seamless integration with the APS-U control architecture. The system utilizes the Experimental Physics and Industrial Control System (EPICS) input/output controllers (IOCs) to interface with front-end instruments. By leveraging EPICS IOCs, the system achieves high reliability and flexibility.

Funding Agency

*Work supported by U.S. Department of Energy, Office of Science, Office of Basic Energy Sciences, under Contract No. DE-AC02-06CH11357

I have read and accept the Privacy Policy Statement Yes
Please consider my poster for contributed oral presentation No
Would you like to submit this poster in student poster session on Sunday (August 10th) No

Author

Shifu Xu (Argonne National Laboratory)

Co-authors

Hairong Shang (Argonne National Laboratory) Bingxin Yang (Argonne National Laboratory)

Presentation materials

There are no materials yet.