Speaker
Description
The first 100 MeV of acceleration for protons and H- ions at the Los Alamos Neutron Science Center (LANSCE) is presently accomplished with a Cockroft-Walton generator (750 keV), followed by four Alvarez drift tube linac (DTL) cavities commissioned in 1970. The RF duty factor is 12 %, leading to significant thermal loading in the room temperature copper structures. Increasing obsolescence and structural reliability problems have created the need for replacements to these systems. The LANSCE Modernization Project (LAMP) developed a conceptual design for the Medium Energy Beam Transport (MEBT) and the Drift Tube Linac (DTL) using new accelerator components. This approach utilizes a Radio Frequency Quadrupole (RFQ) and six replacement DTL cavities. The current 201.25 MHz radio-frequency power amplifier system was replaced 10 years ago and has demonstrated high reliability with Diacrode tube lifetimes over 60,000 hours. We propose an RF amplifier topology that leverages this RF system to provide the required power for LAMP through innovative reconfiguration of the amplifiers.
Funding Agency
This work benefited from the use of the LANSCE accelerator facility. Work was performed under the auspices of the US Department of Energy by Triad National Security under contract 89233218CNA000001.
I have read and accept the Privacy Policy Statement | Yes |
---|---|
Please consider my poster for contributed oral presentation | No |
Would you like to submit this poster in student poster session on Sunday (August 10th) | No |