Speaker
Description
The energy of a bunched non-relativistic ion beam can be deduced from measuring the beam phases in neighboring Beam Position Monitors (BPMs). This report presents estimations on implementation of such a procedure at PIP-II H- linac being constructed at Fermilab. In part, the case when the flight time between BPMs is larger than the period of BPM frequency is considered in detail. When the absolute BPM phase calibration is not available, the BPM phase information can be used to trace deviations of the beam energy from the desired value. Such “energy deviation” parameter is operationally implemented at the transfer line between 400 MeV Linac and the Booster, and its analog is expected to be used in the transfer line from PIP-II as well.
Funding Agency
This work was produced by FermiForward Discovery Group, LLC under Contract No. 89243024CSC000002 with the U.S. Department of Energy, Office of Science, Office of High Energy Physics.
I have read and accept the Privacy Policy Statement | Yes |
---|---|
Please consider my poster for contributed oral presentation | No |
Would you like to submit this poster in student poster session on Sunday (August 10th) | No |