Testing LANSCE 805 MHz CCL Klystrons

WEP084
13 Aug 2025, 16:00
2h
SAFE Credit Union Convention Center

SAFE Credit Union Convention Center

1401 K St, Sacramento, CA 95814
Poster Presentation MC7 – Accelerator Technology and Sustainability WEP: Wednesday Poster Session

Speaker

Aditya Waghmare (Los Alamos National Laboratory)

Description

This paper describes the testing procedure for LANSCE 805 MHz klystrons and describes the current klystron test facility. The 1.25 MW klystrons used for powering LANSCE CCL (side Coupled Cavity Linac) are tested during first installation or after a fault in the modulator system. This klystron testing process is expert dependent and typically takes longer than 1 month to execute. The klystron test facility is used to execute this klystron testing and has various systems in place to diagnose and troubleshoot any issues that arise. LANSCE klystron testing is undergoing various improvements, and the goal of this paper is to point out some of the intricacies in the previously established system.

I have read and accept the Privacy Policy Statement Yes
Please consider my poster for contributed oral presentation Yes
Would you like to submit this poster in student poster session on Sunday (August 10th) No

Author

Aditya Waghmare (Los Alamos National Laboratory)

Co-authors

Joseph Bradley (Los Alamos National Laboratory) William Haynes (Los Alamos National Laboratory)

Presentation materials

There are no materials yet.