7–11 Sept 2025
Teaching Hub 502
Europe/London timezone

Optimization and Upgrade of the BPM Electronics System for CSNS-II RCS

10 Sept 2025, 16:00
2h
Teaching Hub 502

Teaching Hub 502

The University of Liverpool 160 Mount Pleasant L3 5TR Liverpool
Poster Presentation MC03: Beam Position Monitors WEP

Speaker

Ruiyang Qiu (Institute of High Energy Physics)

Description

As the China Spallation Neutron Source (CSNS) Phase II project increases the Rapid Cycling Synchrotron (RCS) power to 500 kW, the signal intensity of Beam Position Monitors (BPMs) is expected to rise tenfold, necessitating a comprehensive upgrade of the electronics system to meet high-power operational requirements. Drawing on the experience of the J-PARC Main Ring (MR) 1.3 MW power upgrade, CSNS optimized the analog front-end using a MicroTCA-based RTM board. The initial four-stage passive resistive divider was upgraded to a switchable attenuator combined with proportional voltage division, alongside impedance matching techniques, ensuring stable signal attenuation under high input voltages, minimal reflections, and compatibility with the Analog-to-Digital Converter (ADC) dynamic range. The digital processing is implemented on a self-developed MicroTCA.4-based AMC board, utilizing the Xilinx Zynq-7045 SoC with 8 channels of 16-bit ADC (125 MSPS). The system has successfully transplanted algorithms, supports real-time beam position calculations, and publishes position signals via EPICS. Tests demonstrate low noise, high linearity, and performance.

I have read and accept the Conference Policies Yes

Author

Ruiyang Qiu (Institute of High Energy Physics)

Co-authors

Fang Li (Institute of High Energy Physics) Lei Zeng (Institute of High Energy Physics) Muhammad Abdul Rehman (Institute of High Energy Physics) Renjun Yang (Institute of High Energy Physics) Weiling Huang (Institute of High Energy Physics) Weiwen Chen (Institute of High Energy Physics) Zhihong Xu (Institute of High Energy Physics)

Presentation materials

There are no materials yet.